-
+
装配物料绑定
@@ -21,7 +21,7 @@
{{ r.materialName || r.materialCode }}
{{ r.materialCode }}
- {{ r.snMode === 1 ? '序列号件·扫码SN' : '批次件·批次' }}
+ {{ r.snMode === 1 ? '序列号=是·扫码SN' : '序列号=否·批次' }}
{{ r.boundCount }}/{{ r.need }}
@@ -39,7 +39,7 @@
@@ -244,7 +244,7 @@ function fillFromBind() {
async function doBind(r) {
const v = (bindInputs.value[r.materialCode] || '').trim()
if (!v) {
- ElMessage.warning('请先扫描/输入' + (r.snMode === 1 ? '序列号件SN' : '批次号'))
+ ElMessage.warning('请先扫描/输入' + (r.snMode === 1 ? '序列号=是的SN' : '批次号'))
return
}
if (!sn.value) {
diff --git a/bj_power_workstation/frontend/src/views/panels/OfflinePanel.vue b/bj_power_workstation/frontend/src/views/panels/OfflinePanel.vue
index 1ca761d..bf36220 100644
--- a/bj_power_workstation/frontend/src/views/panels/OfflinePanel.vue
+++ b/bj_power_workstation/frontend/src/views/panels/OfflinePanel.vue
@@ -146,16 +146,16 @@ function fmt(v) {
return String(v).replace('T', ' ').slice(0, 16)
}
function wpStatusText(s) {
- return { ONLINE: '已上线', PROCESSING: '在制', DONE: '已完工', REPAIR: '返修' }[s] || s || '-'
+ return { ONLINE: '已上线', PROCESSING: '在制', DONE: '已完工' }[s] || s || '-'
}
function wpStatusType(s) {
- return { ONLINE: 'info', PROCESSING: 'primary', DONE: 'success', REPAIR: 'danger' }[s] || 'info'
+ return { ONLINE: 'info', PROCESSING: 'primary', DONE: 'success' }[s] || 'info'
}
function wipStatusText(s) {
- return { ONLINE: '已上线', PROCESSING: '在制', REPAIR: '返修' }[s] || s || '-'
+ return { ONLINE: '已上线', PROCESSING: '在制' }[s] || s || '-'
}
function wipStatusType(s) {
- return { ONLINE: 'info', PROCESSING: 'primary', REPAIR: 'danger' }[s] || 'info'
+ return { ONLINE: 'info', PROCESSING: 'primary' }[s] || 'info'
}
async function onQuery() {
diff --git a/bj_power_workstation/frontend/src/views/panels/OnlinePanel.vue b/bj_power_workstation/frontend/src/views/panels/OnlinePanel.vue
index dc31124..aaf4355 100644
--- a/bj_power_workstation/frontend/src/views/panels/OnlinePanel.vue
+++ b/bj_power_workstation/frontend/src/views/panels/OnlinePanel.vue
@@ -62,7 +62,7 @@
- {{ row.snMode === 1 ? '序列号件' : '批次件' }}
+ {{ row.snMode === 1 ? '序列号=是' : '序列号=否' }}
@@ -122,18 +122,18 @@ const loadingOrder = ref(false)
const submitting = ref(false)
// SN 口径按产品型号/物料档案 sn_mode 分流(2026-09-30 解耦定稿):
-// 1=序列号件:SN 输入必填,扫已在 WMS 入库登记的来料SN,工件 SN=来料SN(不自动发号);
-// 2=批次件:提交后系统自动发号(提交时若未填则本地自动生成);
-// 0=未选择:不可建档,提示先去产品型号/物料档案选择序列号件。
+// 1=序列号=是:SN 输入必填,扫已在 WMS 入库登记的来料SN,工件 SN=来料SN(不自动发号);
+// 2=序列号=否:提交后系统自动发号(提交时若未填则本地自动生成);
+// 0=未选择:不可建档,提示先去产品型号/物料档案选择序列号管理方式。
const snPlaceholder = computed(() => {
if (product.snMode === 1) return '请扫描来料SN(已在WMS入库登记)'
if (product.snMode === 2) return '提交后系统自动发号'
- return '请先在产品型号/物料档案选择序列号件'
+ return '请先在产品型号/物料档案选择序列号管理方式'
})
const snTip = computed(() => {
- if (product.snMode === 1) return '该产品为「序列号件」:请扫描来料SN(需已在 WMS 入库登记),建档后工件 SN = 来料SN,不再自动发号。'
- if (product.snMode === 2) return '该产品为「批次件」:提交后系统自动发号,全程可追溯;成品 SN 与工件 SN 一致。'
- return '该产品的序列号件未选择:请先在 MES 产品型号/物料档案选择「序列号件/批次件」,否则无法建档上线。'
+ if (product.snMode === 1) return '该产品为「序列号=是」:请扫描来料SN(需已在 WMS 入库登记),建档后工件 SN = 来料SN,不再自动发号。'
+ if (product.snMode === 2) return '该产品为「序列号=否」:提交后系统自动发号,全程可追溯;成品 SN 与工件 SN 一致。'
+ return '该产品的序列号管理方式未选择:请先在 MES 产品型号/物料档案选择「序列号=是/否」,否则无法建档上线。'
})
// 上线位在制品:in-process 接口 stationNo<=0 返回全部,此处按 currentStation===0 筛选上线位
@@ -160,17 +160,17 @@ const canSubmit = computed(
)
const blockTip = computed(() => {
if (!form.orderNo) return '请先选择工单号'
- if (product.snMode === 0) return '请先在产品型号/物料档案选择序列号件'
+ if (product.snMode === 0) return '请先在产品型号/物料档案选择序列号管理方式'
if (product.snMode === 1 && !form.sn) return '请扫描来料SN(已在WMS入库登记)'
if (bomItems.value.length && !form.materialChecked) return '请勾选「已按物料清单核对领料」'
return ''
})
function wipStatusText(s) {
- return { ONLINE: '已上线', PROCESSING: '在制', REPAIR: '返修' }[s] || s || '-'
+ return { ONLINE: '已上线', PROCESSING: '在制' }[s] || s || '-'
}
function wipStatusType(s) {
- return { ONLINE: 'info', PROCESSING: 'primary', REPAIR: 'danger' }[s] || 'info'
+ return { ONLINE: 'info', PROCESSING: 'primary' }[s] || 'info'
}
async function loadOrders() {
@@ -182,7 +182,7 @@ async function loadOrders() {
loadingOrder.value = false
}
-// 选工单 → 带出产品编码/名称/序列号件口径 → 查物料清单应领料
+// 选工单 → 带出产品编码/名称/序列号口径 → 查物料清单应领料
async function onOrderChange(orderNo) {
product.code = ''
product.name = ''
@@ -200,7 +200,7 @@ async function onOrderChange(orderNo) {
product.workOrderId = wo.id || 0
product.snMode = Number(wo.productSnMode) || 0
}
- // 批次件:进入即自动生成 SN(提交后系统发号口径),工人无需手填
+ // 序列号=否:进入即自动生成 SN(提交后系统发号口径),工人无需手填
if (product.snMode === 2) genSn()
if (product.code) {
loadingOrder.value = true
@@ -226,7 +226,7 @@ async function onSubmit() {
ElMessage.warning(blockTip.value || '当前不满足建档条件')
return
}
- // 批次件:提交时兜底自动发号(序列号件必须扫来料SN,不自动生成)
+ // 序列号=否:提交时兜底自动发号(序列号=是必须扫来料SN,不自动生成)
if (product.snMode === 2 && !form.sn) genSn()
try {
await ElMessageBox.confirm(
diff --git a/bj_power_workstation/frontend/src/views/panels/WorkPanel.vue b/bj_power_workstation/frontend/src/views/panels/WorkPanel.vue
index 79ebc3c..06be269 100644
--- a/bj_power_workstation/frontend/src/views/panels/WorkPanel.vue
+++ b/bj_power_workstation/frontend/src/views/panels/WorkPanel.vue
@@ -566,10 +566,10 @@ async function onTempStore() {
/* ---------- 5.2 在制品:点击某工件 → 继续该工件的工艺步骤填报 ---------- */
function wipStatusText(s) {
- return { ONLINE: '已上线', PROCESSING: '在制', REPAIR: '返修' }[s] || s || '-'
+ return { ONLINE: '已上线', PROCESSING: '在制' }[s] || s || '-'
}
function wipStatusType(s) {
- return { ONLINE: 'info', PROCESSING: 'primary', REPAIR: 'danger' }[s] || 'info'
+ return { ONLINE: 'info', PROCESSING: 'primary' }[s] || 'info'
}
function fmtDwell(sec) {
const n = Number(sec || 0)
diff --git a/sql/db_comments_mes.sql b/sql/db_comments_mes.sql
index 8def6f5..f30a2c3 100644
--- a/sql/db_comments_mes.sql
+++ b/sql/db_comments_mes.sql
@@ -388,7 +388,7 @@ COMMENT ON COLUMN "workpiece"."sn" IS '工件唯一SN';
COMMENT ON COLUMN "workpiece"."order_no" IS '所属工单';
COMMENT ON COLUMN "workpiece"."work_order_id" IS '工单ID';
COMMENT ON COLUMN "workpiece"."current_station_no" IS '最后完成报工的工位号(0=未报任何工艺;下一道=工艺组合中工位号更大的下一条)';
-COMMENT ON COLUMN "workpiece"."status" IS 'ONLINE(已进线) / PROCESSING(在工位) / DONE(完工) / REPAIR / SCRAPPED';
+COMMENT ON COLUMN "workpiece"."status" IS 'NEW(待上线) / ONLINE(已进线) / PROCESSING(在工位) / SEMI_STORED(半成品入库) / DONE(完工) / SCRAPPED(报废)';
COMMENT ON COLUMN "workpiece"."online_at" IS '进线时间';
COMMENT ON COLUMN "workpiece"."done_at" IS '完工时间';
COMMENT ON COLUMN "workpiece"."created_at" IS '创建时间';
diff --git a/工作台账.md b/工作台账.md
new file mode 100644
index 0000000..f5cb148
--- /dev/null
+++ b/工作台账.md
@@ -0,0 +1,229 @@
+# 全量工作台账(六类 ~40 项)
+
+> 生成时间:2026-10-12(孙彦飞审计,Trae 执行核对)
+> **本轮纪律:只交清单,不动代码;不 commit、不重建 exe;`产线布局说明.md` 一字未改(仅第三步列修改点)。**
+> 所有 file:line 均来自实际文件核查(非凭记忆)。
+> 状态图例:✅已落地 / 🟡部分 / ⬜未启动 / 🔍待扫(精确行号未定位,需下轮补扫)
+
+---
+
+## 第一步:全量清单表(A–F 每行列:现状一句话 / file:line / 依赖 / 建议批次)
+
+### A 类|流程/模型改造(计划.md 阶段1-2)
+
+| # | 项 | 现状(一句话) | file:line(核查所得) | 依赖 | 建议批次 |
+|---|---|---|---|---|---|
+| A1 | 工单/排产方案A-①工单状态枚举删 PENDING/CONFIRMED | ⬜未启动 | `bj_power_mes/internal/logic/workorder.go:387` workOrderStatuses | 无 | 阶段1(详见第四步) |
+| A2 | 方案A-②工单流转表删 PENDING/CONFIRMED/RELEASED | ⬜未启动 | `workorder.go:396` workOrderTransitions | 无 | 阶段1 |
+| A3 | 方案A-③SetWorkOrderStatus 守卫 RELEASED 并入 IN_PROGRESS | ⬜未启动 | `workorder.go:412-449` | 无 | 阶段1 |
+| A4 | 方案A-④statusTextCN 删旧文案补"下发并开工" | ⬜未启动 | `workorder.go:455` statusTextCN | 无 | 阶段1 |
+| A5 | 方案A-⑤工单删除限制(仅 CREATED 可删) | 🟡基本满足(需确认) | `workorder.go:83` SetStatus | 无 | 阶段1 |
+| A6 | 方案A-⑥日排产启用校验"工单未开工不能启用" | 🟡基本满足(用 RELEASED 守卫) | `dailyplan.go:436` | A1-A4 | 阶段1 |
+| A7 | 方案A-⑦syncPlansByOrderStatus 联动(IN_PROGRESS→PENDING 置 PROCESSING) | 🟡基本满足 | `dailyplan.go:240-248` | A1-A4 | 阶段1 |
+| A8 | 方案A-⑧工单页状态按钮/动作删 PENDING/CONFIRMED/RELEASED | ⬜未启动 | `bj_power_mes/frontend/src/pages/WorkOrder.vue`(行号待扫) | A1-A4 | 阶段1 |
+| A9 | 方案A-⑨自动排产弹窗文案改"下发并开工后自动生效" | ⬜未启动 | `WorkOrder.vue`(行号待扫) | A1-A4 | 阶段1 |
+| A10 | 方案A-⑩状态筛选下拉 | ⬜未启动 | `WorkOrder.vue`(行号待扫) | A1-A4 | 阶段1 |
+| A11 | 方案A-⑪工位终端可见工单删 RELEASED(只认 IN_PROGRESS) | ⬜未启动 | `internal/logic/processflow.go:486-503` | A1-A4 | 阶段1 |
+| A12 | 方案A-⑫清旧状态数据 + 案例.md/help.js 同步 | ⬜未启动 | 数据 + `案例.md:89,95` + `help.js`(见 E2/E3) | A1-A11 | 阶段1 |
+| A13 | 工件 status 六态 + 单字段 + 删库 | 🟡部分落地(schema+分流已改;旧数据未删、REPAIR 未清) | `schema/workpiece.go:29-33`;`internal/logic/workpiece.go` DoneWorkpiece | 删库需授权 | 已部分做,收尾下轮 |
+| A14 | 建工单(CREATED)预生成 SN,全 NEW | ⬜未启动 | 建单逻辑(`workorder.go` 待扫精确行) | A13 + 一.2措辞 | 阶段2 |
+| A15 | 建档资格:新件=工序1工位;半成品=后续工序工位 | ⬜未启动 | `bj_power_workstation/.../OnlinePanel.vue:125-127`;MES `OnlineWorkpiece` | 一.3/一.4 + 终端MES双向 | 阶段2 |
+| A16 | 上线次数=状态驱动无限循环(出库解锁) | ✅已落地 | `workpiece.go` reonline 置 ONLINE;`semi.go` CountSemiStored | — | 已做 |
+| A17 | 下线完工分流 DONE / SEMI_STORED | ✅已落地 | `workpiece.go` DoneWorkpiece(按成品工艺是否结束分流) | — | 已做 |
+| A18 | 流程卡按事实记录、多条拼接、不标跳过 | 🔍待扫(ProcessCard 实现未核) | 流程卡相关 logic/handler(行号待扫) | — | 阶段2 |
+| A19 | C1/C15 降级普通点位、0/13 废弃 | ⬜未启动(文档+help 仍引用0/13) | `help.js:180`(MES);`workstation/help.js:110,134-138`;`Main.vue` 0/13 路由 | 一.9/一.10 + 终端 visibleTabs 重构 | 阶段2/3 |
+| A20 | 落点范围(工位+主线,不含接驳台/库房) | ⬜未启动 | — | 一.11 | 阶段2 |
+| A21 | 三维度独立 + 工单→排产联动 | 🟡基本满足(随 A13 收口) | — | A13 | 阶段1 |
+
+### B 类|六条待办(问题.md L1-6)
+
+| # | 项 | 现状(一句话) | file:line | 依赖 | 建议批次 |
+|---|---|---|---|---|---|
+| B1 | WMS"未上架"脏数据清除 | ⬜未启动(须先查来源再删) | `bj_power_wms/frontend/.../Inventory.vue`("⚠未上架N" 展示,行号待扫);后端统计逻辑待扫 | — | 阶段4-T1 |
+| B2 | WMS 物料档案序列号列 → "是/否" | ⬜未启动 | `bj_power_wms/frontend/.../BaseData.vue`(物料档案列表,行号待扫) | — | 阶段4-T2 |
+| B3 | MES 物料类别显示"原材料" | ⬜未启动(先查数据来源) | MES 物料档案页(行号待扫) | — | 阶段4-T3 |
+| B4 | MES"工位绑定"→"工位管理"(菜单/路由/权限/标题/help 五处) | ⬜未启动 | 菜单 `router/index.js`;`Station.vue` 标题;权限 role;`help.js`(五处行号待扫) | — | 阶段4-T4 |
+| B5 | 工位终端叫料流程(讨论稿:时机/到料检查/分批/配置项) | ⬜未启动(先出讨论稿) | `bj_power_workstation/.../MaterialPanel.vue`(叫料,行号待扫) | 一.11/落点 | 阶段4-T5 |
+| B6 | 整体项目规划(头脑风暴:拧紧枪/扫码枪/巡检pad/AGV/PLC 三端显示) | ⬜未启动(单独会议对齐) | 见 D 类 | D1-D5 | 阶段4-T6 |
+
+### C 类|全项目统一(**未收口**,逐项列,不写"已统一")
+
+| # | 项 | 现状(一句话) | file:line(证据) | 依赖 | 建议批次 |
+|---|---|---|---|---|---|
+| C1 | 操作列统一(宽度分档/居中/固定/颜色/更多),WMS+MES ~30 页 | ⬜未启动(无统一组件/规范) | 含"操作"列的页面:**WMS 19 个**(`DefectReturn/Outbound/Inventory/Inbound/Inspection/FinishedInbound/EventLog/Semi/RoleManage/ReturnOrder/AttachmentCenter/Agv/AttachmentPanel/BaseData/UserManage/Stocktake/InboundEntry` 等 .vue);**MES 25 个**(`Settings/Station/AttachmentPanel/PageHelp/WorkOrder/Trace/VirtualStation/RoleManage/QualityInspection/ProcessFlow/PlcSend/ProcessCard/Performance/MaterialRequest/ProductType/QtyReport/AlertCenter/AccountManage/Inspect/ProductProcess/DailyPlan/Attachment/AlertRule` 等 .vue) | — | C类专项 |
+| C2 | 筛选统一"查询+重置" | ⬜未启动(部分页有重置,未规范) | WMS 含"重置"的 17 个 .vue(`Semi/UserManage/RoleManage/FinishedInbound/Inspection/Inbound/Inventory/Outbound/Ledger/ReturnOrder/Stocktake/DefectReturn/ChangePassword/BaseData/AttachmentCenter/Agv/EventLog`) | — | C类专项 |
+| C3 | 筛选大小写不敏感(后端 *Fold) | 🟡部分(仅部分查询用,非全量) | MES:`attachment.go:73,76`、`alert.go:88`、`inspection.go:244-250`、`material.go:463-475`、`processflow.go:95,713`、`product.go:235-241`、`productprocess.go:70-79`;WMS:`attachment/where.go:196-617` 多处 `FieldContainsFold`。但仍有精确 `EQ`/普通 `Contains` 未覆盖 | — | C类专项(扩至全查询入口) |
+| C4 | 术语黑名单排查(批次件/序列号件/品类/记账方式/工艺集合/BOM/让步接收) | 🟡基本干净(仍有零星待扫) | 序列号件/批次件:代码统一(`MaterialPanel.vue:24,42,247`、`OnlinePanel.vue:65,125-127`、`db_comments_*.sql`);BOM=物料清单一致(`alert_rule.go:30`、`wmsclient/client.go:393,604`);工艺集合→"有序工艺集合"(`db.go:317`);让步接收仅业务文档(`客户问题.md:427`、`案例.md:216`)。未发现 离散件/连续件/品类 等错词 | help.js 全文扫尾 | C类轻量 |
+| C5 | 停用/退回/驳回归橙 | ⬜未做(无橙色约定) | 仅"停用"出现在 `UserManage.vue:147-216`、`BaseData.vue:328-333`;"退回/驳回"为业务动词(`Ledger.vue` 已退回),全项目未见状态色=橙规范 | — | C类专项(色彩规范) |
+| C6 | 布局统一(高频留 tab / 低频走弹窗) | 🔍未评估 | — | — | C类专项 |
+
+### D 类|硬件接入规划(**全空/部分**)
+
+| # | 项 | 现状(一句话) | file:line(证据) | 依赖 | 建议批次 |
+|---|---|---|---|---|---|
+| D1 | PLC 点表/路由/握手时序 ↔ MES 对接 | 🟡部分(对接代码存在,完整性待核) | 协议源:`产线布局说明.md` §四(点表/路由/MW编码/握手 4.0-4.4);MES 代码:`internal/plc/plc.go,tcp.go,mock.go`、`schema/plc_send_log.go`、`PlcSend.vue`、`handler/production/plc_torque_scan.go`、`dock_pallet.go`、`line.go` | 产线布局说明 | 阶段D |
+| D2 | 拧紧枪(1控3枪/wifi/pset/配置站1;MES 控不控参数) | 🟡采集已接,**MES 不控参数(重申)** | `handler/production/plc_torque_scan.go:67-94` 仅 `TorqueReportHandler`/`ListTorqueRecords`(上报+查询),**无任何 pset/参数下发代码** → 枪本地控制参数,MES 只采集扭矩结果 | 拧紧枪已到货 | 阶段D |
+| D3 | 扫码枪 | 🟡终端侧为主,MES 无独立对接 | `workstation/help.js:107-109`(序列号件扫码);MES 侧无扫码对接代码(扫码在工位终端完成) | — | 阶段D |
+| D4 | 巡检 pad | 🟡复用 MES 质检模块 | `inspection.go`、`QualityInspection.vue`、`Inspect.vue`、`plc_torque_scan.go:96-112` ProcessStepsHandler(按工位渲染巡检终端步骤) | — | 阶段D |
+| D5 | AGV / 海康 RCS | 🟡协议文档齐全,对接客户端待确认 | 协议:`AGV海康.md`(RCS-2000 V4.2 API,WMS/MES 为调用方,§2.1 任务组/任务下发 API);界面:`bj_power_wms/.../Agv.vue`;未定位明确 RCS HTTP 客户端实现 | 海康 RCS 环境 | 阶段D |
+
+### E 类|文档修改点
+
+| # | 项 | 现状(一句话) | file:line | 谁做 | 建议批次 |
+|---|---|---|---|---|---|
+| E1 | 产线布局说明.md 不妥之处 | ⬜未改(只列点,见第三步) | `产线布局说明.md` 第5/45/70/339/363/383/399/411 行等 | 用户手动 | 阶段3 |
+| E2 | 案例.md L87-94 顺序重写(方案A) | ⬜未改(仍是旧"下发→开始执行"两步) | `案例.md:89`(PENDING→日排产启用)、`:95`(下发工单→开始执行 两步) | Trae 改 | 阶段1 |
+| E3 | help.js(0/13 说明、序列号文案、状态机说明) | ⬜未改(含旧0/13模型) | MES `help.js:180`(虚拟工位0/13);`workstation/help.js:110`(工位号0)、`:134-138`(工位号13) | Trae 改 | 阶段3 |
+
+### F 类|散点(Trae 自查 + 待拍)
+
+| # | 项 | 现状(一句话) | file:line | 依赖 | 建议批次 |
+|---|---|---|---|---|---|
+| F1 | PLC↔MES 对账机制 | 🟡设计草案在计划.md 三,未实现 | `计划.md` 三(P1 待拍) | P1 | 阶段D |
+| F2 | 生命周期日志表 | 🟡草案在计划.md 四(workpiece_lifecycle_log) | `计划.md` 四(P2 待拍) | P2 | 阶段2 |
+| F3 | 问题.md 一.2 措辞 | ⬜未改(仍写"工单下发→预生成") | `问题.md:6` | P3 | 阶段1 |
+| F4 | `REPAIR` 状态去留 | 🟡用户已拍"一套枚举干净",待清 | 见第二步证据清单 | A13收尾 | 阶段1 |
+| F5 | ent 默认值机制核实 | ✅已核实(schema 驱动,无需 regen) | 见第二步证据 | — | 已结 |
+| F6 | `WorkpiecesInProcess` 的 0/13 依赖 | ⬜硬编码 0/13 语义,待重构 | `workpiece.go:877,920-927` | A19 | 阶段2 |
+| F7 | 半成品入库页签 | ✅已定走"下线完工"分流(二.2),已落地 | `workpiece.go` DoneWorkpiece SEMI_STORED | — | 已做 |
+| F8 | 预警中心/预警规则 | 🟡MES 已有预警模块(非新需求,待确认范围) | `alert.go`/`alert_rule.go`/`AlertCenter.vue`/`AlertRule.vue` | — | 待拍 |
+| F9 | 离线队列/死信 | 🟡终端离线缓存已有(help 提及),后端死信未见 | `workstation/help.js`(离线缓存重传) | — | 待拍 |
+
+---
+
+## 第二步:先核三件(贴证据,不动代码)
+
+### 1) ent 默认值机制:`schema` 改即生效,无需 `go run ./tools/generate.go`
+
+**结论:已证实。** 生成代码里**没有任何** `Default("ONLINE")` / `Default("NEW")` 字面值(全 `ent/` 目录 grep 零命中)。默认值在运行时从 schema 包取得:
+
+- `bj_power_mes/ent/runtime.go:1704` → `workpieceFields := schema.Workpiece{}.Fields()`(字段来自 schema 包,非写死)
+- `bj_power_mes/ent/runtime.go:1717` → `workpieceDescStatus := workpieceFields[5].Descriptor()`
+- `bj_power_mes/ent/runtime.go:1719` → `workpiece.DefaultStatus = workpieceDescStatus.Default.(string)`
+- `bj_power_mes/schema/workpiece.go:29-30`(已改)→ `field.String("status").Default("NEW")...`
+
+> 因此上一轮把 `schema` 的 `.Default("ONLINE")` 改为 `.Default("NEW")` 后,运行时 `DefaultStatus="NEW"` 直接生效。**无需重新生成 ent**,规避了 regen 风险。
+> 本次**未运行** `go run ./tools/generate.go`(遵"不动代码"纪律);用读源码替代验证,零文件改动。
+
+### 2) `REPAIR` 状态所有引用位置(用户已拍"一套枚举保证干净",待清)
+
+**后端(MES):**
+- `schema/workpiece.go:33` — 注释:`// REPAIR 为历史遗留额外态(不在六态内),保留向后兼容,待用户决策是否退役。`
+- `internal/logic/workpiece.go:264` — `// 严格校验:仅"在制"工件可报工;DONE/REPAIR/SCRAPPED 一律拒绝。`
+- `internal/logic/workpiece.go:876` — `WorkpiecesInProcess` 注释 `(ONLINE/PROCESSING/REPAIR)`
+- `internal/logic/workpiece.go:885` — `workpiece.Status("REPAIR")`(查询在制品含 REPAIR)
+- `internal/logic/workpiece.go:922` — `if wp.Status == "PROCESSING" || wp.Status == "REPAIR"`(推算物理工位)
+
+**前端:**
+- MES `frontend/src/pages/Wip.vue:18,41,100,103` — 状态筛选项 + 统计卡 + 文案
+- MES `frontend/src/pages/WorkOrder.vue:318` — `pieceStatusMap` 含 `REPAIR:'返修'`
+- 工位终端 `workstation/frontend/src/views/panels/OfflinePanel.vue:149,152,155,158`、`OnlinePanel.vue:170,173`、`WorkPanel.vue:569,572` — 状态映射含 REPAIR
+
+**SQL 注释:**
+- `sql/db_comments_mes.sql:391` — `COMMENT ON COLUMN "workpiece"."status" IS '... / REPAIR / ...'`
+
+> 清 `REPAIR` 需同步改上述 11 处(后端3逻辑点 + 前端5文件 + SQL注释1),属 A13 收尾工作。
+
+### 3) `CountSemiStored` + `semiflow` 表结构(确认 INBOUND 是唯一下线入库动作)
+
+**`semiflow` 表结构**(`schema/semi_flow.go:14-44`):
+| 字段 | 类型 | 说明 |
+|---|---|---|
+| id | int | PK |
+| sn | string(64) | 工件SN |
+| orderNo | string(64) | 工单号 |
+| doneProcessCodes | json[] | **已废除**(进度改由 workpiece.currentStationNo 权威) |
+| completedText | string(64) | 完成至工位快照 |
+| **action** | string(20) | **默认 "INBOUND"** |
+| targetDock | string(20) | 目标接驳台 |
+| operator | string(64) | 操作人 |
+| createdAt | time | 创建时间 |
+
+索引:`sn` / `orderNo` / `action`。
+
+**`CountSemiStored`**(`internal/logic/semi.go:91-99`):
+```go
+func (s *Service) CountSemiStored(ctx context.Context, sn string) int {
+ n, err := s.ctx.EntClient.SemiFlow.Query().
+ Where(semiflow.Sn(sn), semiflow.Action("INBOUND")).Count(ctx)
+ ...
+}
+```
+
+**INBOUND 是否为唯一入库动作 → 是。** 全仓库仅两处写 `action`:
+- `internal/handler/station.go:224-228` → `SemiFlow(Action:"INBOUND")`(StationCheckinInternal = 半成品入库登记,注释 `按半成品 INBOUND 流转并通知 WMS 入库`)
+- `internal/logic/workpiece.go:190` → `SemiFlow(Action:"OUTBOUND")`(reonline 出库)
+
+> 即 `INBOUND`=入库、`OUTBOUND`=出库,`CountSemiStored`=count(INBOUND)=入库次数,可追溯(一.5 满足,免迁移)。
+> ⚠️一致性提示:`DoneWorkpiece` 置 `SEMI_STORED` 时**未**直接写 INBOUND semiflow;当前 INBOUND 由 `station.go` 的 checkin 端点写入。需确认"下线完工→SEMI_STORED"与"station checkin→INBOUND"是否为同一动作链,否则入库次数口径可能错位(建议下轮核对这两处调用关系)。
+
+---
+
+## 第三步:产线布局说明.md 修改点清单(**只列不改**,用户手动改)
+
+> 文件首行已声明"禁止 AI 更改/编辑/新增",本轮严格遵守,未触碰。以下为修改建议清单。
+
+| # | 位置(行) | 原文/表述 | 为什么不妥 | 建议改法 |
+|---|---|---|---|---|
+| 1 | 第5行 修正段 | "上料位 = C1(人工投料)" | 一.9 定稿 C1=主线一位、无特殊含义;"上料位"命名赋予 C1 专属业务语义,与降级冲突 | 改为"人工投料点设在主线 C1 位置(仅现场工艺约定,系统不赋予 C1 特殊业务含义)" |
+| 2 | 第45行 表 C1 用途 | "C1 上料位(人工投料)+ 工位1/2 出料停靠" | "兼作...出料停靠位"过度赋予含义;一.9 已说挡路问题人工判定、C1 就是主线一位 | 删除"兼作工位1/2 的出料停靠位",或标注"(现场工艺约定,非系统约束)" |
+| 3 | 第70行 第2点 | "位置:主线左端 C1,兼作工位1/2 的出料停靠位" | 与第45行重复且过度表述(同第2点) | 删除"兼作..."或改注说明 |
+| 4 | 第339/363/383/399/411行 | 5 条标"(生产补充)"(G2→G1、G4→G3、G6→G5、G8→G7、G10→G9) | 用户 L392 已确认"生产补充是我说的"——来源应显式标注,区分点表原文与用户补充 | 每条后加注"〔用户现场补充,L392 确认〕" |
+| 5 | 全文(建议开头/命名说明处) | 未提"0/13 虚拟位已废弃" | 一.10 已废弃 0/13,但文档未声明,外部引用(help.js)仍残留旧说法易混淆 | 开头加一句"本文档不含工位终端虚拟位 0/13(已废弃,见帮助文档)"以闭环 |
+| 6 | 第57行 缓存规则 | "正对工位的停靠位(C1/C4/C7/C10/C13/C15)不缓存" | C1 在此既"不缓存"又"上料位",与第1-3点表述呼应,建议统一 | 与第1-3点一并统一 C1 措辞 |
+| 7 | 第103行 方向约束 | "C1 可进 G1~G12" | 与一.11 落点范围(工位+主线)一致,留作参考,无需改 | 仅标注"与一.11 一致" |
+
+> 说明:文档本身**未出现 0/13 虚拟位**(与一.10 废弃方向一致),0/13 残留主要在 `help.js`(见 E3),故本文件实质修改量小(主要是 C1 措辞 + 生产补充来源标注)。
+
+---
+
+## 第四步:阶段1 完整清单(工单/排产方案A,对应计划.md 阶段1 十二项)
+
+> ⚠️**影响面关键澄清**:`PENDING/CONFIRMED/RELEASED` 在仓库里是**多套状态机混用**,方案A **只动"工单状态(work_order.status)"那一套**:
+> - `dailyplan.go` 的 `PENDING=待启用` / `CONFIRMED=已启用` 是**日排产自己的状态**,方案A 保留(自动排产弹窗要保留),**不能砍**。
+> - `material_request` / `plc_send_log` / `material_qty_report` 的 `PENDING` 是各自实体状态,**不能砍**。
+> - `Inspect.vue:472` 的 `RELEASED='已发布'` 是**质检实体**,**非工单**,不能砍。
+> 以下 file:line 为已定位的工单状态相关落点(前端 WorkOrder.vue 精确行号下轮补扫)。
+
+| # | 计划.md 阶段1 项 | 改动点 | file:line | 改前(原文/行为) | 改后(目标) | 影响面(全扫引用处) |
+|---|---|---|---|---|---|---|
+| 1 | 工单状态枚举删 PENDING/CONFIRMED | 删 map 项 | `workorder.go:387` workOrderStatuses | 含 PENDING/CONFIRMED 键 | 移除 | 仅工单状态;不动日排产/物料 |
+| 2 | 工单流转表删 PENDING/CONFIRMED/RELEASED | 删 map 项+行 | `workorder.go:396` workOrderTransitions | 含 PENDING/CONFIRMED/RELEASED 行 | 移除;CREATED→{IN_PROGRESS,CANCELLED} | 同上 |
+| 3 | SetWorkOrderStatus 守卫 RELEASED 并入 IN_PROGRESS | 合并分支 | `workorder.go:412-449` | RELEASED 独立分支 | RELEASED 逻辑并入 IN_PROGRESS | 同上 |
+| 4 | statusTextCN 删旧文案补"下发并开工" | 改文案 map | `workorder.go:455` statusTextCN | 旧"已创建/已下发/执行中"等 | 加"下发并开工";去 RELEASED 文案 | WorkOrder.vue 状态映射同步 |
+| 5 | 工单删除限制(仅 CREATED 可删) | 确认项 | `workorder.go:83` SetStatus | 已基本满足 | 保留确认 | — |
+| 6 | 日排产启用校验"工单未开工不能启用" | 改守卫 | `dailyplan.go:436` | `wo.Status != "RELEASED" && != "IN_PROGRESS"` | 改为 `!= "IN_PROGRESS"`(删 RELEASED 引用) | 日排产仍用 PENDING/CONFIRMED |
+| 7 | syncPlansByOrderStatus 联动 | 确认项 | `dailyplan.go:240-248` | IN_PROGRESS→PENDING 置 PROCESSING | 保留 | 日排产状态 |
+| 8 | 工单页状态按钮/动作删 PENDING/CONFIRMED/RELEASED | 改 UI | `WorkOrder.vue`(行号待扫) | CREATED→「下发工单▾」(RELEASED/IN_PROGRESS) | CREATED→「下发并开工▾」(IN_PROGRESS/CANCELLED) | 与 #4 同步 |
+| 9 | 自动排产弹窗文案 | 改文案 | `WorkOrder.vue`(待扫) | "生成后状态为未启用(PENDING),需人工启用" | "下发并开工后自动生效" | — |
+| 10 | 状态筛选下拉 | 改选项 | `WorkOrder.vue`(待扫) | 含 RELEASED/CONFIRMED | 去 RELEASED/CONFIRMED | — |
+| 11 | 工位终端可见工单删 RELEASED(只认 IN_PROGRESS) | 改查询 | `processflow.go:486-503` | `StatusIn("RELEASED","IN_PROGRESS")` | 仅 `IN_PROGRESS` | 工位终端可见工单 |
+| 12 | 清旧数据 + 案例.md/help.js 同步 | 数据+文档 | `案例.md:89,95`(E2);`help.js`(E3);DB 旧状态行 | 旧 PENDING/CONFIRMED/RELEASED 工单行 | 清库 + 文档按方案A重写 | 见 E2/E3 |
+
+**附:工单状态其余引用落点(影响面全扫)**
+- `dashboard.go:758` `case "RELEASED"` → 工单状态,需随 #1-4 移除。
+- `dailyplan.go:371,375` `ListUnplannedWorkOrders` 用 `StatusIn("CREATED","RELEASED","IN_PROGRESS")` → 去 RELEASED。
+- `dailyplan.go:411-436` 日排产启用守卫(用 RELEASED 判断工单已下发)→ 改 #6。
+- `DailyPlan.vue:26-27,92,146,258-260,372,377,379,520-521,658-659` → 日排产 PENDING/CONFIRMED(**保留**,仅 WorkOrder 侧联动改文案)。
+- `Inspect.vue:472-473` RELEASED='已发布' → **质检实体,不碰**。
+
+---
+
+## 待你拍板(Trae 才能排后面)
+
+| # | 事项 | 选项 |
+|---|---|---|
+| P1 | PLC↔MES 对账(计划.md 三) | 做不做 / 轮询间隔 / 三选项(新件建档/绑定纠正/忽略) |
+| P2 | 生命周期日志表(计划.md 四) | 独立表 workpiece_lifecycle_log(推荐)/ 复用 eventlog |
+| P3 | 问题.md 一.2 措辞 | "工单下发"→"建工单(CREATED)预生成 SN"(F3) |
+| P4 | 阶段1 清单 | 核对第四步 12 项后开工 |
+
+---
+
+## 本轮结论(findings-first)
+
+**坏消息**:A/B/C/D 四类基本未动——上一轮只落地了 A13(部分)/A16/A17/F7 五处纯后端模型改动;C 类(操作列/筛选/颜色/术语统一)全项目**未收口**,D 类硬件对接除"拧紧枪采集+PLC 代码骨架"外**基本全空**。
+
+**好消息**:三件必核证据已闭环(ent 默认值无需 regen、REPAIR 引用 11 处已定位、CountSemiStored/semiflow 已确认 INBOUND 唯一下线入库);阶段1 方案A 的**真实影响面**已厘清(多套 PENDING 状态机不能误砍),第四步给出可开工的 12 项清单。
+
+**下一步建议**:先拍 P1-P4 → 开工阶段1(方案A 12项,含案例.md/help.js 同步)→ 再推进 C 类统一专项与 D 类硬件对接。是否就 P1-P4 给结论、并授权开工阶段1?
diff --git a/案例.md b/案例.md
index 5bb7ea8..4d4af60 100644
--- a/案例.md
+++ b/案例.md
@@ -86,13 +86,13 @@
### 8. 自动排产并启用
-工单列表行操作点「自动排产」(若工单没勾组合,按钮置灰并提示「请先选择工艺组合」)。弹窗说明原文:「自动排产仅排「未开工数量 = 工单总数 − 已完工 − 在产未完工」,生成后状态为未启用(PENDING),需到「日排产」页面人工启用后生效。」选排产日期范围 2026-09-22 至 09-23、模式「平均分摊」、总数量 10,确认后回显「自动排产已生成(待人工启用)」。
+工单列表行操作点「自动排产」(若工单没勾组合,按钮置灰并提示「请先选择工艺组合」)。弹窗说明原文:「自动排产仅排『未开工数量 = 工单总数 − 已完工 − 在产未完工』,生成后状态为未启用(PENDING);工单『下发并开工』时自动启用本工单全部日期的排产,无需再到『日排产』页面人工启用。」选排产日期范围 2026-09-22 至 09-23、模式「平均分摊」、总数量 10,确认后回显「自动排产已生成(待下发并开工自动启用)」。
-切到「生产管理 → 日排产」:该排产行状态「未启用」,点「启用」,确认弹窗「确认启用该排产(WO-20260922-001 2026-09-22)?」→ 状态变「已启用」。「送达接驳台」列由工艺组合自动派生为 DOCK02、DOCK05、DOCK06、DOCK08。各工位分产量此处无需手填(页面提示:「送达接驳台与工位产量分配由工单「工艺组合」自动派生,此处无需手填;如需调整工位产量,启用后点击「编辑」设置。」)——未配置时同工艺工位自动平均分:工位 2 = 5 台、工位 5 = 5 台(场景四演示手工调整)。
+切到「生产管理 → 日排产」:该排产行初始状态「未启用」——工单未开工前点「启用」会提示「工单未开工,不能启用排产」;待工单「下发并开工」后,本工单全部日期的排产由系统自动置为「已启用」。「送达接驳台」列由工艺组合自动派生为 DOCK02、DOCK05、DOCK06、DOCK08。各工位分产量此处无需手填(页面提示:「送达接驳台与工位产量分配由工单『工艺组合』自动派生,此处无需手填;如需调整工位产量,启用后点击『编辑』设置。」)——未配置时同工艺工位自动平均分:工位 2 = 5 台、工位 5 = 5 台(场景四演示手工调整)。
-### 9. 工单下发、开工与工位组合下发
+### 9. 工单下发并开工与工位组合下发
-回到工单管理:行状态下拉先点「下发工单」(状态 已创建 → 已下发),再点「开始执行」(状态 → 执行中)。
+回到工单管理:行状态下拉点「下发并开工」(状态 已创建 → 执行中),一次完成下发与开工;本工单全部日期的未启用排产随之自动启用,无需再逐条到「日排产」手动启用。
进入「现场作业 → 工位组合下发」:页顶说明——工位组合由工单「工艺组合」按工位号升序自动派生,系统保证「上一条未收到完成信号前不下发下一条」。选工单 WO-20260922-001、选该工单已上线的工件号后,「当前工位」自动带出(只读);点「下发工位码」→ 回显「工位码下发成功(未收到完成信号不会下发下一条)」。「下发记录」页签里该条状态「已下发」。(产线控制器未接入,此步只做系统记账,由人工按记录执行流转。)
diff --git a/问题.md b/问题.md
index 861eee1..59c5ea0 100644
--- a/问题.md
+++ b/问题.md
@@ -239,3 +239,145 @@ C2/C3(缓存位) 工件已经上线、在缓存区 ? 这个描述不对
> 【L1949|已定稿】PAUSED 保留;砍 PENDING/CONFIRMED/RELEASED + 清库;联动范围 = 全部日期(一.13)。
〔DeepSeek·终稿·精简〕转发 Trae 的执行指令:A 方案确认、三件拍板、先交完整清单(file:line + 改前/改后)再改、改完交 diff 级清单、不 commit、不重建 exe。
+
+---
+
+## 五、代码修复记录(2026-10-12,孙彦飞审计执行)
+
+### 5.1 结论:当前代码仍是「旧模型」,与一/二定稿对立
+核查实际代码(非凭记忆),MES 后端仍按旧口径实现,与问题.md 已定稿结论冲突点:
+- `bj_power_mes/schema/workpiece.go`:`status` 枚举为 `ONLINE/PROCESSING/DONE/REPAIR/SCRAPPED`,**缺 `NEW`/`SEMI_STORED`,默认 `ONLINE`**(一.1/一.6 要求预生成 SN 为 `NEW`、仅上线建档置 `ONLINE`)。
+- `bj_power_mes/internal/logic/workpiece.go` `DoneWorkpiece`:**无论成品工艺是否结束一律置 `DONE`**,无 `SEMI_STORED` 分流(违反二.2/一.7)。
+- `reonlineWorkpiece`:半成品出库(OUTBOUND)后**未把状态置回 `ONLINE` 解锁**(违反一.5「出库一次解锁一次」)。
+- 入库次数:`semiflow` 已逐次记录 INBOUND,但**未在任何追溯出口暴露**(一.5 要求可追溯)。
+
+### 5.2 本次已修复(纯后端逻辑;`go build`/`go vet` 通过;未动前端、未碰 0/13、无需迁移)
+1. **一.1 六态枚举 + 默认 NEW**
+ - `bj_power_mes/schema/workpiece.go` L29-30:
+ - 改前:`// ONLINE(已进线) / PROCESSING(在工位) / DONE(完工) / REPAIR / SCRAPPED` + `.Default("ONLINE")`
+ - 改后:注释标注六态 `NEW/ONLINE/PROCESSING/SEMI_STORED/DONE/SCRAPPED` + `.Default("NEW")`
+ - 注:`REPAIR` 不在六态内,但被多处(`WorkpiecesInProcess`/`applyBinds`)引用,**保留为历史遗留额外态**,待你决策是否退役(不擅自删除,避免连带破坏)。
+ - 生效机制:ent 的 `DefaultStatus` 在 `ent/runtime.go` init 时从 schema 描述符动态读取(`workpieceDescStatus.Default`),**改 schema 即生效,无需重新生成 ent**。
+2. **二.2 + 一.7 下线完工按成品工艺分流**
+ - `bj_power_mes/internal/logic/workpiece.go` `DoneWorkpiece`:
+ - 改前:直接 `SetStatus("DONE")`。
+ - 改后:先算 `routeCount = len(RouteStationsFromWO(wo))`、`reported = 已报工(DONE)工序数`;`routeCount>0 && reported 纪律遵守:**未 commit、未重建 exe**;`产线布局说明.md` 一字未动(仅列点,见 6.5);旧数据清库因沙箱无 DB 连接未动(授权后可删)。`go build ./...` 与 `go vet ./internal/logic/...` 均 EXIT=0。
+
+### 6.1 已改(落地并自验)
+
+**A. 工单/排产方案 A(一.13)**
+- `bj_power_mes/internal/logic/workorder.go`:`workOrderStatuses`/`workOrderTransitions` 删 PENDING/CONFIRMED/RELEASED,`CREATED→IN_PROGRESS(下发并开工)/CANCELLED`;`statusTextCN` 补「下发并开工」;`CreateWorkOrder` 按 quantity 预生成 SN(全 NEW,上限 999,同事务 bulk);`UpdateWorkOrder`/`DeleteWorkOrder` 加「有 SN≠NEW 禁改/禁删」守卫;删除仅限 CREATED。
+- `dailyplan.go`:`SetDailyPlanStatus` 启用校验改「工单未开工,不能启用排产」(`wo.Status != IN_PROGRESS`);`ListUnplannedWorkOrders` 改 `CREATED,IN_PROGRESS`;`syncPlansByOrderStatus` 保持(IN_PROGRESS→全部日期 PENDING 置 PROCESSING)。
+- `processflow.go`:工位可见工单只认 `IN_PROGRESS`。`dashboard.go`:RELEASED 视为已开工。
+- 前端 `WorkOrder.vue`/`DailyPlan.vue`:状态按钮/排产文案/筛选同步,删 PENDING/CONFIRMED/RELEASED 分支。
+- 守口未动:dailyplan 自身 PENDING/CONFIRMED、material_request/plc_send_log 的 PENDING、Inspect.vue 的 RELEASED。
+
+**B. 工件生命周期六态(一.1/一.2/一.6/一.7/一.5)**
+- `schema/workpiece.go`:六态 `NEW/ONLINE/PROCESSING/SEMI_STORED/DONE/SCRAPPED` + `Default(NEW)`;新增 `at_station`(物理位置,与 current_station 业务位置区分,解决 PLC↔MES 对账「件已到岗未报工」滞后误报);REPAIR 注释标「已退役」。
+- `logic/workpiece.go`:`OnlineWorkpiece` 分流新件/半成品;新增 `onlineNewWorkpiece`(新件资格=工序1工位)、`reonlineWorkpiece` 落点+`at_station`+出库一次解锁一次;`ReportProcess` 同事务写 `at_station`+REPORT 流水;`DoneWorkpiece` 按成品工艺走完与否分流 `DONE/SEMI_STORED`、清 `at_station`;REPAIR 逻辑清退(报工校验/WorkpiecesInProcess)。
+
+**C. 生命周期日志表(三 / P2)**
+- 新建 `schema/workpiece_lifecycle_log.go` + ent 生成 `workpiece_lifecycle_log` 表;三处状态变更点(上线/报工/下线完工)同事务写流水(action: NEW/ONLINE/REPORT/SEMI_IN/SEMI_OUT/DONE/SCRAPPED)。
+- `semi.go`:删 `CountSemiStored`,改 `CountSemiIn = count(action='SEMI_IN')`;`Trace` 出口 `semiStoredCount` 同步改源。
+
+**D. REPAIR 清退(六.6,11 处)** — grep 全仓 REPAIR 逻辑引用 = 0 残留(后端 workpiece.go 报工/WorkpiecesInProcess/schema 注释 + SQL 注释 + 前端 WorkOrder/Wip/OnlinePanel/OfflinePanel/WorkPanel)。
+
+**E. 六条待办 B 类(五)**
+- **B4 工位绑定→工位管理**:`MainLayout.vue` 菜单、`router/index.js` 标题、`EventLog.vue` 筛选项、`help.js` 标题与引用;**权限码 `produce.station` 原样保留**。
+- **B2 WMS 物料档案序列号列**:`BaseData.vue` `snModeText` 由「逐件录SN/按数量」改「是/否/-」,对齐 MES `ProductType.vue`。
+
+**F. 全项目统一 C 类(六)**
+- **停用/退回/驳回转橙**:停用状态 tag 由灰 `info` 改橙 `warning`——`AlertRule.vue`、`ProductProcess.vue`、`Station.vue`、WMS `BaseData.vue`(6 处)。(退回/驳回经查均为操作按钮/数量字段,非状态 tag,无需转色。)
+
+**G. 文档同步(七)**
+- `案例.md` §8/§9 按方案 A 重写:合并「下发并开工」、自动排产生成 PENDING 后随下发并开工自动启用(全部日期)、日排产未开工禁手启用。
+- `help.js`:虚拟位 0/13 废弃表述、工件六态状态机、虚拟位降级为普通虚拟工位、上线/下线由 `station.visibleTabs` 驱动——已重写。
+
+### 6.2 没改 / 受阻(缺规格或缺数据源,按「不凭记忆、独立审计」不臆造)
+
+- **四、PLC↔MES 对账(缺口1)**:`计划.md` 三标注「待拍板 P1」;终稿 P1-P4(事件驱动/T1-T7/四选项/G1~G10+C15)不在上下文,且仓库**无 PLC 信号读取层**(仅有 PlcSendLog 下发,无 OPC/Modbus 读)。数据基础已备:`at_station`+`workpiece_lifecycle_log`+`event_log`。
+- **B1 清 WMS「未上架 10 条」脏数据**:需 DB 访问列清单+删,沙箱无连接,未动。
+- **B3 MES 物料类别显示「原材料」**:`ProductType.vue` 按 itemType(3 成品/4 其他/else 原材料) 映射;MES 物料档案是 WMS 成品视图,理论上应全 itemType=3。显示「原材料」= 实际数据 itemType≠3,**需查 MES material 表实际分布**才能定改映射还是改数据。
+- **C 类其余 4 项**(操作列统一 / 筛选查询+重置 / 后端 *Fold / 术语黑名单):跨多页面一致性专项,未全仓扫完,未动。
+
+### 6.3 剩什么需你拍(按优先级)
+1. #8 对账:给 P1-P4 终稿 + 明确 PLC 信号如何进 MES(点位轮询服务 / 外部推送接口)。给了即可在本会话补完。
+2. DB 连通或授权清库(B1 脏数据 + 工单/工件旧状态数据)。
+3. B3:MES `material.itemType` 实际分布。
+4. C 类 4 项:要不要我按「统一交互规范 v1.0」全仓扫一遍集中改?
+5. `案例.md` / `产线布局说明` 列点是否要我出完整稿。
+
+### 6.4 附:两条讨论稿(未定稿,供你对齐)
+
+**B5 工位终端叫料(讨论稿)**
+- 触发时机(多选配置,落 MES 基础设置):① 开工叫(工单下发并开工即叫首批);② 早上叫(每日 0 点扫当日启用排产);③ 有启用排产即可叫;④ 有备料单即可叫;⑤ WMS 主动推(不等工位叫)。默认建议 ①+②。
+- 叫料依据:日排产(启用)× 工单工艺组合 → 单台含损耗用量 → WMS 合格库存;缺料触发「备料未齐套」预警。
+- 到料检查:工人自检(系统不强制扫码验收),签收即记账。
+- 分批送料:支持(按备料单行分批,接料量累加)。
+- 到料送达位置:工位两个接驳台(GxR1/GxR2),AGV 配送。
+- 结论:以上做成「叫料策略」配置项,多选;到料自检 + 分批默认开。
+
+**B6 整体规划 · D 类家底(盘点)**
+- 已就位:拧紧枪(1 控制器 3 枪、WiFi、pset、配置站 1)——数据经扭矩记录入 MES;扫码枪(建档/绑定 SN);巡检 PAD(巡检终端页);AGV(2 台公用,接驳台 GxR1/R2 + 库房 JBT21);PLC 点表(工位/主线/接驳台 46 位,仅 PlcSendLog 下发,读取侧待接)。
+- 三端显示口径:MES(后台管理/追溯/排产)、WMS(库存/台账/出入库)、工位终端(作业/叫料/点位)。拧紧数据只入 MES 追溯,不在 WMS/终端重复展示。
+- 待接:PLC 读取(对账前提)、拧紧枪与工位/SN 绑定落库细节、巡检 PAD 与过程检口径打通。
+
+### 6.5 产线布局说明.md 列点(**未改该文件**,仅列)
+- 该文档**未出现 0/13 虚拟位/上线位/下线位**表述(那套口径在 help.js/终端,已按一.10 改毕),故 0/13 废弃对此文档基本无列点。
+- 唯一可斟酌处:主线编址处「上料位 = C1」为物理事实(工件仍从 C1 进,L1129/L1220 已确认),可保留;如需强调「C1/C15 无特殊业务含义(一.9)」,可在 C1/C15 说明处补一句「均降级为普通主线位,无特殊业务定义」。**留给你手动定。**
+
+### 6.6 C 类收口 + B3 根因修复(2026-10-12 夜 · 续,能做实的全部做完)
+
+**C4 术语黑名单 —— 已清零**(grep 全前端 = 0 残留):
+- MES `help.js`:「递归 BOM」×2 →「物料清单递归组成」。
+- 工位终端 `MaterialPanel.vue`/`OnlinePanel.vue`:「序列号件/批次件」×10 → 统一「序列号=是/序列号=否」表述(含提示语、占位符、注释)。
+- 工位终端 `help.js`:5 处禁词清除;**顺带修正「上线建档运行在产线进线口(工位号 0)」→ 改为页签配置驱动、0/13 已废弃**(与一.10 对齐)。
+- `MaterialRequest.vue` 注释 BOM → 物料清单。
+
+**C5 停用归橙 —— 已收口**:全前端 grep `'info'`+停用/禁用/驳回/退回 = 0 残余(前批 6 处已改;UserManage 状态列用 format 函数非 tag,无需改)。
+
+**C2 筛选查询+重置 —— 已收口**:MES/WMS 全部含「查询」按钮的页面均已有「重置」,无缺失。
+
+**C3 后端大小写不敏感(*Fold)—— 已收口**:MES logic 普通 `Contains(` 仅剩 3 处,均为错误消息匹配/手写 ToLower 比较(等价 fold),筛选入口无遗漏。
+
+**C1 操作列统一 —— 机械项收口**:
+- 全前端 `label="操作"` 缺 `align="center"` 仅 1 处:工位终端 `InspectPanel.vue` —— 已补。
+- 缺 `fixed` 的 15 处经逐点核对**全部是弹窗/嵌套子表窄列**(AttachmentPanel/ProcessFlow 步骤表/Inspect/InboundEntry SN 清单/Outbound·Semi 明细/QualityInspection),加 fixed 反致固定列阴影错位,**保持现状是正确结论,不是欠账**。
+- 「宽度分档/更多」属设计级(需统一组件/规范文档),仓库无《统一交互规范》文件,未动。
+
+**C6 布局统一(高频 tab/低频弹窗)—— 评估结论:无需动**:高频页(工单/日排产/备料单/库存/在制品)均为主列表 tab + 低频操作弹窗,现状即符合,无改造点。
+
+**B3 MES 物料类别显示「原材料」—— 根因坐实 + 代码级修复**(数据修正待 DB):
+- 根因链:`schema/material.go` `itemType.Default(1)`=原材料 + `materialsync.go UpsertLocalMaterial` 同步落库 `SetItemType(req.ItemType)` **不校验 0/缺省** → WMS 推送未带类别时落 0/1 → `ProductType.vue` 映射 `else→原材料` 误显。
+- 修复:① `UpsertLocalMaterial` 更新分支——类别仅显式合法值(1/2/3/4)才覆盖、否则保留本地值(与 snMode 禁止落 0 同款口径);② 新建分支——`resolveItemType` 兜底,未带合法类别落 **3 成品**(本页=WMS 成品视图);③ 前端映射补全 `2→半成品`、`0/未知→'-'`,让「原材料」只在真 1 出现;④ 本地兜底建档 `product.go` 已 `SetItemType(3)`,无需改。
+- `go build ./...` EXIT=0。**遗留**:库内已落 0/1 的存量行需一条 UPDATE 刷成 3(需 DB 连接,授权后执行)。
+
+**至此可执行项全部做完。剩 3 件需你:① #8 对账终稿+PLC 信号接入方式;② DB 连接(B1 清脏数据、B3 存量行修正、工单/工件旧状态清库);③ C1 设计级如需「宽度分档/更多」组件化,先给《统一交互规范》。**